In the beginning ...

In the beginning ...
side of house

house front

Saturday, February 28, 2009

Friday February 27, the end of the month




We especially like the finish on the framing on the enclosed front verandah (will be a family room/study). The extension is starting to look like a house.
The builder said that we have to do a walk through with the electrician soon because he will be ready. We've looked at lights and fans and think we know what to get.
Before Christmas Mummy spent lots of time organising the bathroom fittings so that is all done, everything is waiting in Darwin to be delivered. As well as the ensuite vanity. The bathroom vanity and mirrors are waiting to clear customs but we shouldn't need those for a little while. Better to be organised.
The cupboards that were damaged by the water leak when we had people renting the house in 2006, are getting replaced soon. Mummy says that's good because we will have somewhere to put all the crap when the kitchen and bathroom are being demolished.
Mummy is a bit cranky because someone flicked cigarette butts under the house. The garden under the family room/study is full of them. Mummy says that is takes up to 12 years for cigarette butts to break down and has put a container on the downstairs coffee table for the builders and will talk to them tomorrow.

Mummy's industrial craft


This is what Mummy makes with her coral and driftwood.

From the inside


This is looking out, the builders had to take the old French door to get a new frame made for the downstairs bedroom.
And this is what it looks like from the study. But you don't want to open the glass sliding door!

Last week


Check out the funky roofline and upstairs bedroom frames. Take notice of the extra bracing in the bedroom (upstairs and downstairs) frames, we have strict building codes up here, everything has to be up the cyclone code. That's part of the reason building is so expensive here in the Top End.
Mummy is excited that the louvre frames have been delivered but worries now about the colour for the powdercoated aluminium, it has to match the existing louvres. Ian says it will be fine and to ask the builder on Monday. We ran into problems with the glazing, the Australian standard says that you can't have more than 28% of floor space as glazing, which is really stupid in the tropics when you want louvres to catch all the breeze, so you don't have to use aircon. So we had to have aluminium and glass louvres, which is OK because that is what the old house part has.

February 25, back on track


The builder says we are back on scedule despite the rain. Hoping we're finished mid-June to accommodate the dry season vistors. We've already warned visitors that they might have to sleep in swags under the house if the renovation is not completed in time.
With the high cost of rentals in Darwin and the huge amount of money we are spending on the renovation, we have to stay living here. Mummy says it will be an adventure, we have the barbeque and downstairs fridge. We'll only have to go to Grandma Bobbies when the water is turned off for the bathrooms to be fitted out.
Check out the groovy roof line on the master bdroom extension. Our good friend Hully, who is a brilliant architect, helped us with our renovation. Mummy says we will be eternally grateful. And Hully has given us his "people", the engineer, draftsman, builder .... so we hope we are in good hands. So far we like everyone we've met.
Check out the steel and off cuts. Mummy wants to make wind chimes with the short bits. She's into industrial craft and wants to learn how to weld. She makes us pick up driftwood at the beach for her projects. Ian says with the collapse of the Aussie dollar, the drop in price of steel doesn't benefit us.



Mummy's day off





Mummy had today off so the first thing she told the builders was that no one could have their bum crack showing. She said the builders are, on the whole, quite nice to look at, but she's a little over natal clefts. Mummy also says the builders are nice boys who make an OK effort cleaning up after themselves and don't leave skiddies in our toilet.
But it is like having lots of visitors staying with you, the house doesn't totally feel like home anymore. Lily, our dog, is even more neurotic. She doesn't like new people. She was going to Grandma Bobbies during the day, but has to stay here on the verandah now, because she dug up Bobbie's garden.
Here is the upper floor.
Another variation and more dollars, dry rot in the front verandah joists. Better to deal with it now.

What's wrong with bamboo?






February 20 and have a look at our scaffolding! The boys who put it up know their business. Our friend says it's added at least $5000 to our costs but it would be pretty hard to deal with a workplace accident that could have been avoided.
One small problem, oops, it's Friday afternoon and someone's forgotten to collect the left over bits of meccano. Just a little road hazard!
Our friends come over for drinks to toast the new slab and framework. Mummy says that with the amount of money we are spending, she needs to have someone go "ooh, aah, very nice".

Now it's all coming together





February 19 and look how far along we've come downstairs.

A month on ...




The slab has been poured. The schedule is out the window with all the rain we've had, but the builder is trying to make up time by prefabbing the frames off-site. The A/C have been moved, we survived a couple of nights without them, it was quite cool with the rain. The WIR framing is up, so we will have to start designing the layout.

February 17


And there go the beautiful Jarrah floorboards, the joists had to be shaved down to accommodate the new ensuite floor.

February 15, the existing middle bedroom






The before and after shots. This is being converted into the master bedroom ensuite and WIR. The extension is to accommodate the master bedroom and downstairs, the guest bedroom and another bathroom. And now no access.

Ming Ming's birthday


Ming Ming had her 4th birthday February 11, a Dora beach party. With half the yard cordoned off (Mummy had asked Ian to get some crime scene tape, thought it would be a bit more fun than the usual orange bunting), we decided to emphasize the pool. Check out the cake, Mummy's first ever birthday cake (both Aunty Cecile and Jenny, the cake queens, weren't available this year). OK, so it was a Woolworths slab sponge but we made it look like a sand castle, even if the icing was the colour of baby poo.
At least the builders liked the left overs until Mummy had to throw out the rest because Ian didn't cover up the defrosted chicken necks for our dog, Lily, and Mummy was worried about ooze contamination in the downstairs fridge. But the builders also got to eat the leftover chocloate biscuits and smarties.

Into February



Goodbye to the front steps that no-one ever used, the Torres Strait pidgeons might miss crapping on the verandah. So far the add on costs have included a new ORG (for sewerage) and new frames for the existing French doors which are to be recycled downstairs. This is despite having engaged people with the relevant expertise in engineering, hydraulics (plumbing), drafting and building, to hopefully avoid such pitfalls. At least the builder is switched on. Would hate to be disorganised!

Moving along slowly



We want to recycle the verandah floorboards so the boys spent a weekend pulling them up. Good exercise!

More darwin wet season



And more and more and more rain

January 22, Darwin's wet season



And guess what, it wasn't going to happen in a hurry. The plumber hit rock, (hey, Larrakeyah is a rocky peninsula), a concrete slab from pre-1975 (do we live where the original fire station was?) and of course it rained and rained (well, it is the wet season).

January 21st, it's all happening

Day One, the plumber means business!